Inspection ReportRelated Reports Bright Futures George W. Nebinger
601 Carpenter St
PHILADELPHIA, PA 19146
Inspection Date: 09/30/2024
45 The handwashing sink located in the children's restroom area was observed not properly sealed to the adjoining wall.
Bright Futures George W. Nebinger
601 Carpenter St
PHILADELPHIA, PA 19146
Inspection Date: 09/30/2024
Bright Futures George W. Nebinger
601 Carpenter St
PHILADELPHIA, PA 19146
Inspection Date: 10/02/2023
48 A hot water delay was observed at the handwashing sink located in the children's restroom area. Hot water took approximately 2 minutes to reach peak demand.
Bright Futures George W. Nebinger
601 Carpenter St
PHILADELPHIA, PA 19146
Inspection Date: 10/02/2023
Bright Futures George W. Nebinger
601 Carpenter St
PHILADELPHIA, PA 19146
Inspection Date: 10/12/2022
Bright Futures George W. Nebinger
601 Carpenter St
PHILADELPHIA, PA 19146
Inspection Date: 10/12/2022
53 Coved base vinyl in the classroom toilet room was in poor repair.
Bright Futures George W. Nebinger
601 Carpenter St
PHILADELPHIA, PA 19146
Inspection Date: 05/24/2022
Bright Futures George W. Nebinger
601 Carpenter St
PHILADELPHIA, PA 19146
Inspection Date: 05/24/2022
|
|